Encapsulation

Residential Asbestos Removal has been a pioneer in Preventive Measure Encapsulation, a process of applying a new, strong jack over asbestos pipe or boiler insulation.

An open weave of fiberglass cloth or scrim is wrapped around insulation, then a trowel grade white mastic (or bridging encapsulant) is applied by hand, then brushed out, creating a strong yet elastic barrier between you and the asbestos.

Documentation
After every job, the owner will receive a letter from Residential explaining the laboratory report of the air testing performed after the removal or encapsulation of asbestos, with the certified laboratory report. The manifest documenting proper disposal at a certified EPA asbestos disposal sight will also be enclosed for each project where asbestos was removed.